Gunite undertook cleaning and restoration trials of the Grade II* listed Cripps Building in 2008. Doff was identified as the most effective method for cleaning the concrete. Sample defects were broken out and repaired using Remmers Betofix RM repair material to within 15mm of the surface of the
concrete.
Credits
Gunite (Eastern) Ltd